In Focus: Radiation Protection at Works Relating to TEPCO's Fukushima Daiichi Nuclear Power Plant Accident

Exposure Dose Distribution of the Workers at Fukushima Daiichi Nuclear Power Plant

Updated on 29 Mar 2024

1. Radiation Exposure Dose Distributions

(1)The distribution of external exposure dose of the workers during the last 3 months
(Numbers of workers who entered each area every month)
Effective dose (E) mSv December-2023 January-2024 February-2024
TEPCO Contractors Total TEPCO Contractors Total TEPCO Contractors Total
100<E 0 0 0 0 0 0 0 0 0
75<E≤100 0 0 0 0 0 0 0 0 0
50<E≤75 0 0 0 0 0 0 0 0 0
20<E≤50 0 0 0 0 0 0 0 0 0
10<E≤20 0 2 2 0 0 0 0 3 3
5<E≤10 0 61 61 0 18 18 0 40 40
1<E≤5 17 522 539 9 380 389 8 489 497
E≤1 1037 6378 7415 984 6457 7441 1036 6434 7470
Total 1054 6963 8017 993 6855 7848 1044 6966 8010
Maximum(mSv) 3.70 10.20 10.20 1.90 8.00 8.00 1.89 12.14 12.14
Average(mSv) 0.08 0.33 0.29 0.06 0.24 0.22 0.07 0.30 0.27

(*)Exposure doses and the number of workers are subject to change due to the replacement of accumulated doses measured using PAD with monthly doses measured using an integrating dosimeter and the reflection of values for workers wearing only an integrating dosimeter (e.g., workers working only within a seismically isolated building).

(2)Combined Cumulative Effective Dose from April 2021 (Internal and External)
Effective dose (E) mSv April 2021 - January 2024 April 2021 - February 2024 Difference
TEPCO Contractors Total TEPCO Contractors Total TEPCO Contractors Total
100<E 0 0 0 0 0 0 0 0 0
75<E≤100 0 0 0 0 0 0 0 0 0
50<E≤75 0 1 1 0 1 1 0 0 0
20<E≤50 21 922 943 21 955 976 0 33 33
10<E≤20 49 1593 1642 55 1652 1707 6 59 65
5<E≤10 102 1544 1646 98 1573 1671 -4 29 25
1<E≤5 347 2630 2977 355 2647 3002 8 17 25
E≤1 1228 7628 8856 1220 7715 8935 -8 87 79
Total 1747 14318 16065 1749 14543 16292 2 225 227
Maximum(mSv) 30.32 50.62 50.62 30.54 50.62 50.62 - - -
Average(mSv) 1.71 4.80 4.47 1.74 4.87 4.54 - - -

(*) Exposure doses and the number of workers are subject to change due to the replacement of accumulated doses measured using PAD with monthly doses measured using an integrating dosimeter and the reflection of values for workers wearing only an integrating dosimeter (e.g., workers working only within a seismically isolated building).

(3) Combined Cumulative Effective Dose from April 2023
Effective dose (E) mSv April 2023 - January 2024 April 2023 - February 2024 Difference
TEPCO Contractors Total TEPCO Contractors Total TEPCO Contractors Total
100<E 0 0 0 0 0 0 0 0 0
75<E≤100 0 0 0 0 0 0 0 0 0
50<E≤75 0 0 0 0 0 0 0 0 0
20<E≤50 0 0 0 0 0 0 0 0 0
10<E≤20 2 602 604 3 716 719 1 114 115
5<E≤10 24 1026 1050 25 1100 1125 1 74 75
1<E≤5 153 1940 2093 166 2085 2251 13 145 158
E≤1 1213 6448 7661 1208 6384 7592 -5 -64 -69
Total 1392 10016 11408 1402 10285 11687 10 269 279
Maximum(mSv) 10.60 16.70 16.70 11.69 16.82 16.82 - - -
Average(mSv) 0.50 2.12 1.92 0.54 2.26 2.05 - - -
(*)
Exposure doses and the number of workers are subject to change due to the replacement of accumulated dosesmeasured using PAD with monthly doses measured using an integrating dosimeter and the reflection of values for workers wearing only an integrating dosimeter (e.g., workers working only within a seismically isolated building).
(4) Distribution of sum of external exposure dose and internal exposure dose of workers engaged in specified high-dose work*
(Specified high-dose work has not been performed since October 2015.)
Effective dose (E) mSv March 2011- September 2015
100<E 1
75<E≤100 191
50<E≤75 233
20<E≤50 267
10<E≤20 186
5<E≤10 129
1<E≤5 145
E≤1 51
Total 1203
Maximum(mSv) 102.69
Average(mSv) 36.49

(As specified high-dose work has not been performed since October 2015, the table shows the data up to September 2015.)

(*)
Workers engaged in work to which dose limit (100 mSv) during emergency work is applied in line with Article 7 of the Ordinance on Prevention of Ionizing Radiation Hazards.
Specifically, these workers are those who are engaged in work to maintain the functions of a nuclear reactor facility or spent fuel storage pool, or in work to maintain functions to suppress or prevent the possible release of a large amount of radioactive materials due to a failure of or damage to the nuclear reactor facility at a location around the nuclear reactor facility, steam turbine, or accessory facility where hourly dose may exceed 0.1 mSv.
It should be noted that only TEPCO employees have so far been engaged in specified high-dose work.
(*)
The number of workers engaged in specified high-dose work is that of workers who were registered as such at least once during the period between March 2011 and September 2015.
(*)
Exposure doses and the number of workers are subject to change due to the replacement of accumulated doses measured using PAD with monthly doses measured using an integrating dosimeter and the reflection of values for workers wearing only an integrating dosimeter (e.g., workers working only within a seismically isolated building).
(*)
The results of re-evaluating committed doses in March 2011 reveal that maximum cumulative effective doses for the period between March 2011 and September 2015 exceeded 100.