Ministry of Health, Labour and Welfare

Ministry of Health, Labour and Welfare

In Focus: Radiation Protection at Works Relating to TEPCO's Fukushima Daiichi Nuclear Power Plant Accident

Exposure Dose Distribution of the Workers at Fukushima Daiichi Nuclear Power Plant

Updated on 31 Oct 2023

1. Radiation Exposure Dose Distributions

(1)The distribution of external exposure dose of the workers during the last 3 months
(Numbers of workers who entered each area every month)
Effective dose (E) mSv July-2023 August-2023 September-2023
TEPCO Contractors Total TEPCO Contractors Total TEPCO Contractors Total
100<E 0 0 0 0 0 0 0 0 0
75<E≤100 0 0 0 0 0 0 0 0 0
50<E≤75 0 0 0 0 0 0 0 0 0
20<E≤50 0 0 0 0 0 0 0 0 0
10<E≤20 0 0 0 0 0 0 0 2 2
5<E≤10 0 21 21 0 12 12 0 37 37
1<E≤5 2 580 582 4 326 330 11 521 532
E≤1 996 6020 7016 1029 6045 7074 1045 6084 7129
Total 998 6621 7619 1033 6383 7416 1056 6644 7700
Maximum(mSv) 2.30 7.60 7.60 2.60 7.60 7.60 2.99 10.54 10.54
Average(mSv) 0.06 0.31 0.28 0.05 0.21 0.19 0.06 0.30 0.27

(*)Exposure doses and the number of workers are subject to change due to the replacement of accumulated doses measured using PAD with monthly doses measured using an integrating dosimeter and the reflection of values for workers wearing only an integrating dosimeter (e.g., workers working only within a seismically isolated building).

(2)Combined Cumulative Effective Dose from April 2021 (Internal and External)
Effective dose (E) mSv April 2021 - August 2023 April 2021 - September 2023 Difference
TEPCO Contractors Total TEPCO Contractors Total TEPCO Contractors Total
100<E 0 0 0 0 0 0 0 0 0
75<E≤100 0 0 0 0 0 0 0 0 0
50<E≤75 0 0 0 0 0 0 0 0 0
20<E≤50 11 716 727 13 756 769 2 40 42
10<E≤20 49 1429 1478 49 1442 1491 0 13 13
5<E≤10 103 1321 1424 102 1382 1484 -1 61 60
1<E≤5 315 2566 2881 328 2568 2896 13 2 15
E≤1 1223 7085 8308 1228 7211 8439 5 126 131
Total 1701 13117 14818 1720 13359 15079 19 242 261
Maximum(mSv) 24.11 46.62 46.62 24.91 47.44 47.44 - - -
Average(mSv) 1.53 4.42 4.09 1.56 4.49 4.15 - - -

(*) Exposure doses and the number of workers are subject to change due to the replacement of accumulated doses measured using PAD with monthly doses measured using an integrating dosimeter and the reflection of values for workers wearing only an integrating dosimeter (e.g., workers working only within a seismically isolated building).

(3) Combined Cumulative Effective Dose from April 2023
Effective dose (E) mSv April 2023 - August 2023 April 2023 - September 2023 Difference
TEPCO Contractors Total TEPCO Contractors Total TEPCO Contractors Total
100<E 0 0 0 0 0 0 0 0 0
75<E≤100 0 0 0 0 0 0 0 0 0
50<E≤75 0 0 0 0 0 0 0 0 0
20<E≤50 0 0 0 0 0 0 0 0 0
10<E≤20 0 158 158 0 234 234 0 76 76
5<E≤10 2 548 550 4 650 654 2 102 104
1<E≤5 83 1401 1484 109 1578 1687 26 177 203
E≤1 1236 6226 7462 1239 6234 7473 3 8 11
Total 1321 8333 9654 1352 8696 10048 31 363 394
Maximum(mSv) 6.30 16.20 16.20 6.99 16.20 16.20 - - -
Average(mSv) 0.24 1.24 1.10 0.29 1.42 1.27 - - -
(*)
Exposure doses and the number of workers are subject to change due to the replacement of accumulated dosesmeasured using PAD with monthly doses measured using an integrating dosimeter and the reflection of values for workers wearing only an integrating dosimeter (e.g., workers working only within a seismically isolated building).
(4) Distribution of sum of external exposure dose and internal exposure dose of workers engaged in specified high-dose work*
(Specified high-dose work has not been performed since October 2015.)
Effective dose (E) mSv March 2011- September 2015
100<E 1
75<E≤100 191
50<E≤75 233
20<E≤50 267
10<E≤20 186
5<E≤10 129
1<E≤5 145
E≤1 51
Total 1203
Maximum(mSv) 102.69
Average(mSv) 36.49

(As specified high-dose work has not been performed since October 2015, the table shows the data up to September 2015.)

(*)
Workers engaged in work to which dose limit (100 mSv) during emergency work is applied in line with Article 7 of the Ordinance on Prevention of Ionizing Radiation Hazards.
Specifically, these workers are those who are engaged in work to maintain the functions of a nuclear reactor facility or spent fuel storage pool, or in work to maintain functions to suppress or prevent the possible release of a large amount of radioactive materials due to a failure of or damage to the nuclear reactor facility at a location around the nuclear reactor facility, steam turbine, or accessory facility where hourly dose may exceed 0.1 mSv.
It should be noted that only TEPCO employees have so far been engaged in specified high-dose work.
(*)
The number of workers engaged in specified high-dose work is that of workers who were registered as such at least once during the period between March 2011 and September 2015.
(*)
Exposure doses and the number of workers are subject to change due to the replacement of accumulated doses measured using PAD with monthly doses measured using an integrating dosimeter and the reflection of values for workers wearing only an integrating dosimeter (e.g., workers working only within a seismically isolated building).
(*)
The results of re-evaluating committed doses in March 2011 reveal that maximum cumulative effective doses for the period between March 2011 and September 2015 exceeded 100.